July 26, 2015

Posted by MaryJo Lauer on 7/22/15

Our brick layers are trying their best to get done, but obstacles keep getting in their way.  This past week they have installed the pre cast concrete on the north side of the main peak, and have laid brick up as far as they can in the main center ... Read More »

July 19, 2015

Posted by MaryJo Lauer on 7/22/15

We got all the plants and shrubs planted -- thanks to all those hardy souls that came out to help with the digging, hauling, planting, and watering.  Everyone there that day can surely say they put their sweat equity in for the new church, as it was an extremely ... Read More »

July 12, 2015

Posted by MaryJo Lauer on 7/13/15

If it did not rain this past Thursday, the concrete for our new parking lot has been poured.  This past week Gana trucking has been grading the parking area and removing excess dirt and then putting a stone base over the entire parking lot.  JA Construction put in the ... Read More »

July 5, 2015

Posted by MaryJo Lauer on 7/05/15

More concrete has been poured.  We now have a sidewalk on the south side of church.  JA Construction also put in the drive apron on Morrill Ave and on 61st St. along with the curbs in the new parking lot, both on the north and south ends.  On Saturday, ... Read More »

June 28, 2015

Posted by MaryJo Lauer on 7/01/15

There has been a lot of activity this past week and a half.  As you drive around the block you will see that the south street parking area concrete has been laid.  Gana Trucking has removed all the old concrete from the south side parking area, sidewalk that was ... Read More »